Shanghai Sunshine Industry Technology Co., Ltd.

To be sincere and keep moving !

Manufacturer from China
Active Member
4 Years
Home / Products / Grab Ship Unloader /

Vessel Grab Type Ship Unloader For Coal And Ore Handling

Contact Now
Shanghai Sunshine Industry Technology Co., Ltd.
City:shanghai
Province/State:shanghai
Country/Region:china
Contact Person:Mrleo
Contact Now

Vessel Grab Type Ship Unloader For Coal And Ore Handling

Ask Latest Price
Video Channel
Brand Name :SSI-HDCZ
Model Number :Customized
Place of Origin :China
MOQ :1
Price :US $1,500,000-5,000,000/ Set
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :20 sets / year
Delivery Time :6 months after receipt of advance payment
Packaging Details :Wooden case or bare
Certification :manufacture certificate
description :Ship Unloader
painting :Jotun
color :by user
capacity :2400 t/h
character :durable
advantage :high performance
benefit :low cost
steel work :carbon steel
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Grab Type Ship Unloader for Coal and Ore Handling Ship Unloader Bulk Material Handling Ship Unloader


The ship unloader is mainly installed on the port,unloading dry bulk cargoes from vessel`s hold via grab bucket. Discharging dry bulk cargoes to the hopper, then to the conveyor belt via hopper. By conveyor belt the dry bulk cargoes are conveying to the stockyard for storaging.

The traveling of the mechanical differential grab ship unloader trolley depends on a driving motor to connect the two differential reducers through the a coupling. Through the differential transformation of the gearbox, the grab lifting is transformed into the transverse movement of the trolley.

model Self-propelled trolley Main and auxiliary trolley Mechanical differential Electric differential
weight(%) 100% 80% 60~65% 60%
stability 1.4 1.5 1.7~1.8 1.7~1.8
Wire rope lengtg 1 6 2.5 2.5
Power consumption 1 2.5 1.1 1.2
Operating cost(%) 100% 95% 90% 90%
Fault and maintenance Breakdown rate high and hard to maintain Breakdown rate low and easy to maintain but wire rope system is complicated Wire rope system is simple, easy to change gear reducer is specific design,hard to maintain and change Wire rope system is simple,gear reducer is standard,easy to maintain,electrical system is complicated
Cost of fundamental and facilities(%) 100% 95% 85% 85%

model Mechanical differential Electric differential
weight(t) 1100 1050

Rail distance(m)

Wheel distance(m)

18~28

18

18~28

18

No of wheel

Wheel pressure T

Driver KW

40

50

7.5*10

40

50

7.5*10

Luffing mechanism KW 90~110 90~110
Four drums mechanism KW

Start 2X500KW

Runing 315KW

4*400

Specification of ship unloader
vessel capacity unload time lift capacity
of grab
weight of
single grab
cycle
times
one cycle density of
bulk material
rail
distance
rail wheel
pressure
extending reach distance
of grab
rear reach
distance of grab
hoisting
speed
lowering
speed
trolley
speed
traveling
speed
DWT t/h hours T T s t/m3 m kN m m m/min m/min m/min m/min
1000 340 2.94 10 5.5 61.82 58.23529412 0.85 16 QU80 350 23 21 90 100 120 25
5000 500-2000 2.5~10 12.5~48 7.3~28 67.42~71.43 52.56-53.4 0.8~0.9 10.5~20 QU80~100 245~600 24~28 8~16 100~160 120~190 150~240 20
8000 1000 8.00 25 14.8 67.57 53.28 20 QU100 350 28 17 135 150 180 20
20000 800-1000 20.00 22~30 13.3~14.8 55.56~67.57 53.28~64.8 0.85 16~22 QU80~120 330~530 24~38 21 12~135 135~150 180 20~25
30000 1250 24.00 32 19.6 63.78 56.448 0.95 16 QU100 505 33 14 135 150 220 25
35000 800~1600 21.88~43.75 22~40.5 12.8~25 62.52~76.19 54~57.6 0.85~0.95 14~24 QU80~100 330~530 27~31 11~19 120~135 135~180 180~220 20~25
50000 1250~1650 33.3~40 32~40 19.5~25 60~67.35 56.16~60 0.85~0.95 22~26 QU100~120 500~520 30~33 17~19 150~200 180~240 180~220 20~25
70000 1250~1750 40~56 34~42 20.5~25.75 52.08~68 53~69.12 0.85~0.9 22~30 QU100~120 500~600 32~40 16.5~27 160~220 190~240 180~240 20~25
100000 1000~1800 55.56~100 30~46 18~27.6 55.56~75.12 48~64.8 0.8-1 22~26 QU120 450~600 30~38 17~20 135~180 150~220 180~240 25
150000 1800~2100 71.42~83.33 45~52 27.2~31.5 63.16~66.67 54~57 0.90~2.4 24~28 QU120 600~736 39~41.5 19~24 160~200 190~240 200~240 20~25

Main structure of bridge-type grab ship unloader

Mechanism of bridge-type grab ship unloader

1.Traveling mechanism

Vessel Grab Type Ship Unloader For Coal And Ore Handling

2. Main structure of bridge-type ship unloader

Vessel Grab Type Ship Unloader For Coal And Ore Handling

3. Hopper system

Vessel Grab Type Ship Unloader For Coal And Ore Handling

4. Grab bucket hoisting mechanism(mechanical differential four drums)

Vessel Grab Type Ship Unloader For Coal And Ore Handling

5.Grab bucket(wire rope reeving system)

Vessel Grab Type Ship Unloader For Coal And Ore Handling

6. Luffing mechanism

Vessel Grab Type Ship Unloader For Coal And Ore Handling

7.Wire rope reeving system of luffing mechanism

Vessel Grab Type Ship Unloader For Coal And Ore Handling

8. Cantilever safety hook device

Vessel Grab Type Ship Unloader For Coal And Ore Handling

9.Wire rope reeving system of wire rope support trolley

Vessel Grab Type Ship Unloader For Coal And Ore Handling

Overview of production process

Vessel Grab Type Ship Unloader For Coal And Ore Handling

Vessel Grab Type Ship Unloader For Coal And Ore Handling

Vessel Grab Type Ship Unloader For Coal And Ore Handling

Inquiry Cart 0